GATE EE 2015 Set 2 — Question 50

Go beyond PYQs with Success TrackerAI-powered personalised practice and doubt support. Unlimited practice on eligible plans; AI usage limits apply.
NAT+2 / -0MediumEconomic Load DispatchEconomic Operation & CompensationPower Systems

Power Systems → Economic Operation & Compensation → Economic Load Dispatch

Last updated

Question

The incremental costs (in Rupees/MWh) of operating two generating units are functions of their respective powers P1P_1 and P2P_2 in MW, and are given bydC1dP1=0.2P1+50\frac{dC_1}{dP_1} = 0.2P_1 + 50dC2dP2=0.24P2+40\frac{dC_2}{dP_2} = 0.24P_2 + 40where20 MWP1150 MW20\text{ MW} \leq P_1 \leq 150\text{ MW}20 MWP2150 MW20\text{ MW} \leq P_2 \leq 150\text{ MW}For a certain load demand, P1P_1 and P2P_2 have been chosen such that dC1/dP1=76 Rs/MWhdC_1/dP_1 = 76\text{ Rs/MWh} and dC2/dP2=68.8 Rs/MWhdC_2/dP_2 = 68.8\text{ Rs/MWh}. If the generations are rescheduled to minimize the total cost, then P2P_2 is ______.
Your answer

Enter a number. Decimals, negative values and scientific notation are accepted.

The solution stays hidden until you check.

Continue learning with Success Tracker

A step still unclear? Work through it with support

Use Success Tracker to ask about the reasoning, then try another GATE EE question to check your understanding.

AI-powered practice· Unlimited practice on eligible plans
PYQs with solutions
Attempt available previous-year questions, then compare your reasoning with the worked solution. Coverage varies by stream.
Practice that adapts
Choose a topic, work on weaker areas and bookmark questions to revisit. Your attempts feed your progress tracking.
AI doubt support
Ask follow-up questions about a step or concept while practising, instead of stopping at the final answer.

Unlimited practice is available on eligible plans. Free practice and AI usage have limits; check the current plan allowances before choosing.

This page stays readable without an account. AI responses can be wrong; check them against the solution and source material.

More questions on Economic Operation & Compensation