GATE EE 2022 Set 1 — Question 56

Go beyond PYQs with Success TrackerAI-powered personalised practice and doubt support. Unlimited practice on eligible plans; AI usage limits apply.
NAT+2 / -0MediumParallel OperationSynchronous MachinesElectrical MachinesLoad Frequency ControlEconomic Operation & CompensationPower Systems

Electrical Machines → Economic Operation & Compensation → Load Frequency Control

Last updated

Question

Two generating units rated for 250 MW250\text{ MW} and 400 MW400\text{ MW} have governor speed regulations of 6%6\% and 6.4%6.4\%, respectively, from no load to full load. Both the generating units are operating in parallel to share a load of 500 MW500\text{ MW}. Assuming free governor action, the load shared in MW, by the 250 MW250\text{ MW} generating unit is _________. (round off to nearest integer)
Your answer

Enter a number. Decimals, negative values and scientific notation are accepted.

The solution stays hidden until you check.

Continue learning with Success Tracker

A step still unclear? Work through it with support

Use Success Tracker to ask about the reasoning, then try another GATE EE question to check your understanding.

AI-powered practice· Unlimited practice on eligible plans
PYQs with solutions
Attempt available previous-year questions, then compare your reasoning with the worked solution. Coverage varies by stream.
Practice that adapts
Choose a topic, work on weaker areas and bookmark questions to revisit. Your attempts feed your progress tracking.
AI doubt support
Ask follow-up questions about a step or concept while practising, instead of stopping at the final answer.

Unlimited practice is available on eligible plans. Free practice and AI usage have limits; check the current plan allowances before choosing.

This page stays readable without an account. AI responses can be wrong; check them against the solution and source material.

More questions on Economic Operation & Compensation