Question
A water treatment plant treats 25 MLD water with a natural alkalinity of 4.0 mg/L (as ). It is estimated that, during coagulation of this water, 450 kg/day of calcium bicarbonate () is required based on the alum dosage. Consider the atomic weights as: Ca-40, H-1, C-12, O-16.The quantity of pure quick lime, CaO (in kg) required for this process per day is___________ (rounded off to 2 decimal places).
Correct answer
99 to 100
Solution
1.Calculate the total alkalinity required as equivalent:
The amount of calcium bicarbonate required is 450 kg/day.Equivalent weight of .
Equivalent weight of .
Alkalinity required (as ) = kg/day.
2.Calculate the natural alkalinity available in the water:
Flow rate = 25 MLD = L/day.Natural alkalinity = 4.0 mg/L as .
Alkalinity available = kg/day as .
3.Calculate the alkalinity to be added:
Alkalinity to be added = Total required - Natural available = kg/day as .4.Calculate the quantity of pure quick lime (CaO) required:
Equivalent weight of .CaO required = (Alkalinity to be added as )
CaO required = kg/day.Rounding to 2 decimal places, we get 99.56 kg/day.
Continue learning with Success Tracker
A step still unclear? Work through it with support
Use Success Tracker to ask about the reasoning, then try another GATE CE question to check your understanding.
AI-powered practice· Unlimited practice on eligible plans
- PYQs with solutions
- Attempt available previous-year questions, then compare your reasoning with the worked solution. Coverage varies by stream.
- Practice that adapts
- Choose a topic, work on weaker areas and bookmark questions to revisit. Your attempts feed your progress tracking.
- AI doubt support
- Ask follow-up questions about a step or concept while practising, instead of stopping at the final answer.
Unlimited practice is available on eligible plans. Free practice and AI usage have limits; check the current plan allowances before choosing.
This page stays readable without an account. AI responses can be wrong; check them against the solution and source material.
More questions on Drinking Water Treatment
2026 Set 1 Q21A rapid sand filter bed of depth m has % porosity during service cycle. It is…2026 Set 1 Q22The settling velocity of inorganic particles in the sedimentation tank of a water treatment plant…2026 Set 1 Q25Which of the following components is/are NOT removed in the secondary treatment of sewage?2026 Set 2 Q27Column I presents common air pollutants, and column II presents treatment technologies commonly…2026 Set 2 Q28One-third of the solid matter in a sludge containing water is composed of fixed mineral…