GATE CE 2026 Set 2 — Question 24
Go beyond PYQs with Success TrackerAI-powered personalised practice and doubt support. Unlimited practice on eligible plans; AI usage limits apply.MCQ+1 / -0.33EasyCant DeficiencyRailway Track DesignTransportation Engineering
Transportation Engineering → Railway Track Design → Cant Deficiency
Last updated
Question
Which one of the following statements is TRUE?
Correct answer
(A) Cant deficiency is related to train moving faster, and Cant excess is related to train moving slower.
Solution
In railway engineering:
1.Cant deficiency occurs when a train travels around a curve at a speed higher than the equilibrium speed for which the cant (superelevation) was designed. The provided cant is less than what is required for that higher speed.
2.Cant excess occurs when a train travels around a curve at a speed lower than the equilibrium speed. The provided cant is more than what is required for that lower speed.
Thus, statement (A) is true.Continue learning with Success Tracker
A step still unclear? Work through it with support
Use Success Tracker to ask about the reasoning, then try another GATE CE question to check your understanding.
AI-powered practice· Unlimited practice on eligible plans
- PYQs with solutions
- Attempt available previous-year questions, then compare your reasoning with the worked solution. Coverage varies by stream.
- Practice that adapts
- Choose a topic, work on weaker areas and bookmark questions to revisit. Your attempts feed your progress tracking.
- AI doubt support
- Ask follow-up questions about a step or concept while practising, instead of stopping at the final answer.
Unlimited practice is available on eligible plans. Free practice and AI usage have limits; check the current plan allowances before choosing.
This page stays readable without an account. AI responses can be wrong; check them against the solution and source material.
More questions on Railway Track Design
2026 Set 1 Q19Corrections are applied to the basic length of the runway strip considering: (i) The elevation …2026 Set 2 Q23An incident occurred on one side of a median on a four-lane dual carriageway road section. This…2026 Set 1 Q24Cant on a Broad Gauge railway track is calculated for an equilibrium speed (in km/h),…2026 Set 2 Q25The primary purpose of the Windrose diagram is for the design of2026 Set 1 Q33The travel times of three vehicles on a km stretch of road are , , and minutes.…