GATE EE 2014 Set 1 — Question 52

Go beyond PYQs with Success TrackerAI-powered personalised practice and doubt support. Unlimited practice on eligible plans; AI usage limits apply.
MCQ+2 / -0.67MediumEconomic Load DispatchEconomic Operation & CompensationPower Systems

Power Systems → Economic Operation & Compensation → Economic Load Dispatch

Last updated

Question

The fuel cost functions of two power plants are
Plant P1P_1: C1=0.05Pg12+APg1+BC_1 = 0.05 P_{g1}^2 + AP_{g1} + B
Plant P2P_2: C2=0.10Pg22+3APg2+2BC_2 = 0.10 P_{g2}^2 + 3AP_{g2} + 2B
where, Pg1P_{g1} and Pg2P_{g2} are the generated powers of two plants, and AA and BB are the constants. If the two plants optimally share 1000 MW load at incremental fuel cost of 100 Rs/MWh, the ratio of load shared by plants P1P_1 and P2P_2 is
Your answer

Choose one option, then check your answer.

The solution stays hidden until you check.

Continue learning with Success Tracker

A step still unclear? Work through it with support

Use Success Tracker to ask about the reasoning, then try another GATE EE question to check your understanding.

AI-powered practice· Unlimited practice on eligible plans
PYQs with solutions
Attempt available previous-year questions, then compare your reasoning with the worked solution. Coverage varies by stream.
Practice that adapts
Choose a topic, work on weaker areas and bookmark questions to revisit. Your attempts feed your progress tracking.
AI doubt support
Ask follow-up questions about a step or concept while practising, instead of stopping at the final answer.

Unlimited practice is available on eligible plans. Free practice and AI usage have limits; check the current plan allowances before choosing.

This page stays readable without an account. AI responses can be wrong; check them against the solution and source material.

More questions on Economic Operation & Compensation