GATE ME 2020 Set 1 — Question 43

Go beyond PYQs with Success TrackerAI-powered personalised practice and doubt support. Unlimited practice on eligible plans; AI usage limits apply.
MCQ+2 / -0.67EasyLine BalancingProduction Planning & ControlIndustrial EngineeringQueuing Models (M/M/1)Operations Research

Industrial Engineering → Operations Research → Line Balancing

Last updated

Question

For an assembly line, the production rate was 4 pieces per hour4\text{ pieces per hour} and the average processing time was 60 minutes60\text{ minutes}. The WIP inventory was calculated. Now, the production rate is kept the same, and the average processing time is brought down by 30 percent30\text{ percent}. As a result of this change in the processing time, the WIP inventory
Your answer

Choose one option, then check your answer.

The solution stays hidden until you check.

Continue learning with Success Tracker

A step still unclear? Work through it with support

Use Success Tracker to ask about the reasoning, then try another GATE ME question to check your understanding.

AI-powered practice· Unlimited practice on eligible plans
PYQs with solutions
Attempt available previous-year questions, then compare your reasoning with the worked solution. Coverage varies by stream.
Practice that adapts
Choose a topic, work on weaker areas and bookmark questions to revisit. Your attempts feed your progress tracking.
AI doubt support
Ask follow-up questions about a step or concept while practising, instead of stopping at the final answer.

Unlimited practice is available on eligible plans. Free practice and AI usage have limits; check the current plan allowances before choosing.

This page stays readable without an account. AI responses can be wrong; check them against the solution and source material.

More questions on Operations Research