In the context of cross-drainage structures, the correct statement(s) regarding the relative positions of a natural drain (stream/river) and an irrigation canal, is/are
Correct answer
(A) In an aqueduct, natural drain water goes under the irrigation canal, whereas in a super-passage, natural drain water goes over the irrigation canal.; (B) In a level crossing, natural drain water goes through the irrigation canal.
Solution
Based on the definitions of cross-drainage structures:
- Aqueduct: Canal is carried over the drain. Thus, drain water goes under the canal. (Statement A is correct).
- Super-passage: Drain is carried over the canal. Thus, drain water goes over the canal. (Statement A is correct).
- Level Crossing: Canal and drain meet at the same level; their waters mix and pass through. (Statement B is correct).
- Canal Syphon: Drain is carried over the canal, but the canal is depressed to pass under the drain. Drain water goes over, not through. (Statement D is incorrect).
- Statement (C) is the exact opposite of the correct definitions.
Continue learning with Success Tracker
A step still unclear? Work through it with support
Use Success Tracker to ask about the reasoning, then try another GATE CE question to check your understanding.
AI-powered practice· Unlimited practice on eligible plans
- PYQs with solutions
- Attempt available previous-year questions, then compare your reasoning with the worked solution. Coverage varies by stream.
- Practice that adapts
- Choose a topic, work on weaker areas and bookmark questions to revisit. Your attempts feed your progress tracking.
- AI doubt support
- Ask follow-up questions about a step or concept while practising, instead of stopping at the final answer.
Unlimited practice is available on eligible plans. Free practice and AI usage have limits; check the current plan allowances before choosing.
This page stays readable without an account. AI responses can be wrong; check them against the solution and source material.
More questions on Canals & Hydraulic Structures
2026 Set 1 Q16Two reservoirs having different water levels are connected by two long parallel pipelines of same…2026 Set 1 Q17An irrigation canal is to be designed to deliver 10 cumec to meet the peak demand of 7500 hectare…2026 Set 2 Q19The Culturable Command Area (CCA) for a canal is 10000 hectares. The base period for a crop in the…2026 Set 2 Q20Following statements are made with respect to the mass curve of rainfall: (I) Slope at a point on…2026 Set 1 Q23Gradually Varied Flow (GVF) profiles in open channels given in Column 1 are to be matched with the…