A storm with a recorded precipitation of , as shown in the table, produced a direct run-off of .
The -index of this storm is ____________ (rounded off to 2 decimal places).
| Time from start (hours) | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|---|---|---|---|---|---|---|---|---|
| Recorded cumulative precipitation (cm) | 0.5 | 1.5 | 3.1 | 5.5 | 7.3 | 8.9 | 10.2 | 11.0 |
Correct answer
0.64 to 0.65
Solution
1.Calculate total precipitation () and total run-off ():
, .2.Calculate total infiltration ():
.3.Calculate rainfall intensities () for each hour:
5.Since , exclude the first hour. The effective rainfall duration .
6.Recalculate using only periods where :
.7.Check remaining intensities: all are . Thus, .
Continue learning with Success Tracker
A step still unclear? Work through it with support
Use Success Tracker to ask about the reasoning, then try another GATE CE question to check your understanding.
AI-powered practice· Unlimited practice on eligible plans
- PYQs with solutions
- Attempt available previous-year questions, then compare your reasoning with the worked solution. Coverage varies by stream.
- Practice that adapts
- Choose a topic, work on weaker areas and bookmark questions to revisit. Your attempts feed your progress tracking.
- AI doubt support
- Ask follow-up questions about a step or concept while practising, instead of stopping at the final answer.
Unlimited practice is available on eligible plans. Free practice and AI usage have limits; check the current plan allowances before choosing.
This page stays readable without an account. AI responses can be wrong; check them against the solution and source material.
More questions on Hydrology & Precipitation
2026 Set 1 Q16Two reservoirs having different water levels are connected by two long parallel pipelines of same…2026 Set 1 Q17An irrigation canal is to be designed to deliver 10 cumec to meet the peak demand of 7500 hectare…2026 Set 2 Q19The Culturable Command Area (CCA) for a canal is 10000 hectares. The base period for a crop in the…2026 Set 2 Q20Following statements are made with respect to the mass curve of rainfall: (I) Slope at a point on…2026 Set 1 Q23Gradually Varied Flow (GVF) profiles in open channels given in Column 1 are to be matched with the…