GATE ME 2024 Set 1 — Question 34

Go beyond PYQs with Success TrackerAI-powered personalised practice and doubt support. Unlimited practice on eligible plans; AI usage limits apply.
MCQ+1 / -0.33MediumScheduling & Job SequencingProduction Planning & ControlIndustrial Engineering

Industrial Engineering → Production Planning & Control → Scheduling & Job Sequencing

Last updated

Question

A set of jobs U,V,W,X,Y,ZU, V, W, X, Y, Z arrive at time t=0t = 0 to a production line consisting of two workstations in series. Each job must be processed by both workstations in sequence (i.e., the first followed by the second). The process times (in minutes) for each job on each workstation in the production line are given below.
JobUVWXYZ
Workstation 1573468
Workstation 2466857
The sequence in which the jobs must be processed by the production line if the total makespan of production is to be minimized is
Your answer

Choose one option, then check your answer.

The solution stays hidden until you check.

Continue learning with Success Tracker

A step still unclear? Work through it with support

Use Success Tracker to ask about the reasoning, then try another GATE ME question to check your understanding.

AI-powered practice· Unlimited practice on eligible plans
PYQs with solutions
Attempt available previous-year questions, then compare your reasoning with the worked solution. Coverage varies by stream.
Practice that adapts
Choose a topic, work on weaker areas and bookmark questions to revisit. Your attempts feed your progress tracking.
AI doubt support
Ask follow-up questions about a step or concept while practising, instead of stopping at the final answer.

Unlimited practice is available on eligible plans. Free practice and AI usage have limits; check the current plan allowances before choosing.

This page stays readable without an account. AI responses can be wrong; check them against the solution and source material.

More questions on Production Planning & Control