GATE CE 2016 Set 1 — Question 31

Go beyond PYQs with Success TrackerAI-powered personalised practice and doubt support. Unlimited practice on eligible plans; AI usage limits apply.
MCQ+1 / -0.33MediumMarshall Mix DesignBitumen & Mix DesignTransportation Engineering

Transportation Engineering → Bitumen & Mix Design → Marshall Mix Design

Last updated

Question

During a forensic investigation of pavement failure, an engineer reconstructed the graphs P,Q,RP, Q, R and SS, using partial and damaged old reports.
Marshall mixture design output graphs showing Marshall Stability, Flow, Voids filled with bitumen, and Air Voids vs Bitumen Content
Theoretically plausible correct graphs according to the 'Marshall mixture design output' are
Your answer

Choose one option, then check your answer.

The solution stays hidden until you check.

Continue learning with Success Tracker

A step still unclear? Work through it with support

Use Success Tracker to ask about the reasoning, then try another GATE CE question to check your understanding.

AI-powered practice· Unlimited practice on eligible plans
PYQs with solutions
Attempt available previous-year questions, then compare your reasoning with the worked solution. Coverage varies by stream.
Practice that adapts
Choose a topic, work on weaker areas and bookmark questions to revisit. Your attempts feed your progress tracking.
AI doubt support
Ask follow-up questions about a step or concept while practising, instead of stopping at the final answer.

Unlimited practice is available on eligible plans. Free practice and AI usage have limits; check the current plan allowances before choosing.

This page stays readable without an account. AI responses can be wrong; check them against the solution and source material.

More questions on Bitumen & Mix Design