GATE CE 2021 Set 1 — Question 34
Go beyond PYQs with Success TrackerAI-powered personalised practice and doubt support. Unlimited practice on eligible plans; AI usage limits apply.NAT+1 / -0MediumDarcy's Law ApplicationHydrographs & GroundwaterWater Resources EngineeringGroundwater Hydrology
Water Resources Engineering → Hydrographs & Groundwater → Darcy's Law Application
Last updated
Question
Two reservoirs are connected through a homogeneous and isotropic aquifer having hydraulic conductivity () of 25 m/day and effective porosity () of 0.3 as shown in the figure (not to scale). Ground water is flowing in the aquifer at the steady state.
If water in Reservoir 1 is contaminated then the time (in days, round off to one decimal place) taken by the contaminated water to reach Reservoir 2 will be __________.

Correct answer
2400 to 2400
Solution
1.Calculate the hydraulic gradient ():
2.Calculate the discharge velocity () using Darcy's Law:
3.Calculate the seepage velocity ():
4.Calculate the time () taken to travel the distance m:
Rounding off to one decimal place, the time is 2400.0 days.Continue learning with Success Tracker
A step still unclear? Work through it with support
Use Success Tracker to ask about the reasoning, then try another GATE CE question to check your understanding.
AI-powered practice· Unlimited practice on eligible plans
- PYQs with solutions
- Attempt available previous-year questions, then compare your reasoning with the worked solution. Coverage varies by stream.
- Practice that adapts
- Choose a topic, work on weaker areas and bookmark questions to revisit. Your attempts feed your progress tracking.
- AI doubt support
- Ask follow-up questions about a step or concept while practising, instead of stopping at the final answer.
Unlimited practice is available on eligible plans. Free practice and AI usage have limits; check the current plan allowances before choosing.
This page stays readable without an account. AI responses can be wrong; check them against the solution and source material.
More questions on Hydrographs & Groundwater
2026 Set 1 Q16Two reservoirs having different water levels are connected by two long parallel pipelines of same…2026 Set 1 Q17An irrigation canal is to be designed to deliver 10 cumec to meet the peak demand of 7500 hectare…2026 Set 2 Q19The Culturable Command Area (CCA) for a canal is 10000 hectares. The base period for a crop in the…2026 Set 2 Q20Following statements are made with respect to the mass curve of rainfall: (I) Slope at a point on…2026 Set 1 Q23Gradually Varied Flow (GVF) profiles in open channels given in Column 1 are to be matched with the…