GATE CE 2022 Set 2 — Question 19
Go beyond PYQs with Success TrackerAI-powered personalised practice and doubt support. Unlimited practice on eligible plans; AI usage limits apply.MCQ+1 / -0.33EasyChezy EquationOpen Channel FlowWater Resources EngineeringEvapotranspirationHydrology & PrecipitationInfiltrationFlood EstimationHydrographs & GroundwaterUnlined CanalsCanals & Hydraulic Structures
Water Resources Engineering → Canals & Hydraulic Structures → Chezy Equation
Last updated
Question
Match Column X with Column Y:
Which one of the following combinations is correct?
| Column X | Column Y |
|---|---|
| (P) Horton equation | (I) Design of alluvial channel |
| (Q) Penman method | (II) Maximum flood discharge |
| (R) Chezy’s formula | (III) Evapotranspiration |
| (S) Lacey’s theory | (IV) Infiltration |
| (T) Dicken’s formula | (V) Flow velocity |
Correct answer
(A) (P)-(IV), (Q)-(III), (R)-(V), (S)-(I), (T)-(II)
Solution
The correct matches are:
- (P) Horton equation: Used to model (IV) Infiltration capacity of soil over time.
- (Q) Penman method: A widely used method to estimate (III) Evapotranspiration based on energy balance and mass transfer.
- (R) Chezy’s formula: An empirical formula used to calculate (V) Flow velocity in open channels.
- (S) Lacey’s theory: Provides a set of equations for the (I) Design of alluvial channels.
- (T) Dicken’s formula: An empirical formula used to estimate the (II) Maximum flood discharge from a catchment.
Continue learning with Success Tracker
A step still unclear? Work through it with support
Use Success Tracker to ask about the reasoning, then try another GATE CE question to check your understanding.
AI-powered practice· Unlimited practice on eligible plans
- PYQs with solutions
- Attempt available previous-year questions, then compare your reasoning with the worked solution. Coverage varies by stream.
- Practice that adapts
- Choose a topic, work on weaker areas and bookmark questions to revisit. Your attempts feed your progress tracking.
- AI doubt support
- Ask follow-up questions about a step or concept while practising, instead of stopping at the final answer.
Unlimited practice is available on eligible plans. Free practice and AI usage have limits; check the current plan allowances before choosing.
This page stays readable without an account. AI responses can be wrong; check them against the solution and source material.
More questions on Canals & Hydraulic Structures
2026 Set 1 Q16Two reservoirs having different water levels are connected by two long parallel pipelines of same…2026 Set 1 Q17An irrigation canal is to be designed to deliver 10 cumec to meet the peak demand of 7500 hectare…2026 Set 2 Q19The Culturable Command Area (CCA) for a canal is 10000 hectares. The base period for a crop in the…2026 Set 2 Q20Following statements are made with respect to the mass curve of rainfall: (I) Slope at a point on…2026 Set 1 Q23Gradually Varied Flow (GVF) profiles in open channels given in Column 1 are to be matched with the…